Cyclical Works
A series of repairs, repainting and replacements works are carried out on a cyclical basis to maintain estates in good condition. Residents living in older estates get to enjoy same amenities, comfort and convenience as the newer blocks.
ELECTRICAL UPGRADING
Electrical wires and circuits are checked and upgraded with replacements to ensure safety and reliability of power supply to the estates.
LIFT WORKS
Estate lifts and their working components are checked, maintained and replaced on regular basis to ensure safe, reliable lift services are provided to residents with reduced lift downtime.
PUMP MAINTENANCE AND REPLACEMENT
Booster and transfer pumps at blocks are regularly checked, serviced and maintained to ensure consistent water pressure and supply.
REPAIR AND REDECORATION (R&R)
Selected blocks are repainted with fresh coat of paint in an updated colour scheme. Repairs to building exterior such as façade are carried out to improve the aesthetics of the old blocks.
RE-ROOFING
Roof tiles of blocks are checked, with maintenance and necessary replacements.
Cyclical Projects | Location | Status / Revised Target Completion |
---|---|---|
Replacement and Comprehensive Maintenance of Alert Alarm System (AAS) to 15 Blocks | Block 570A, 570B, 571C, 572A, 572B Woodlands Ave 1, Block 886D, 887C Woodlands Dr 50, Block 180A, 180B Marsiling Rd, Block 570, 571, 572, 573, 574 Choa Chu Kang St 52, Block 302A Woodlands St 31 | COMPLETED |
Electrical Rewiring to 30 Blocks | Block 751 to 771, 784 to 792 Choa Chu Kang North 5 / 6 / Street 54 / Drive | COMPLETED |
Replacement of Water Pipes to 57 Blocks | Block 501-518, 523-531, 540-569 Choa Chu Kang Street 51 / Street 52 / North 6 | COMPLETED |
Replacement of Water Pipes to 62 Blocks | Block 601-621, 625-627, 701-708, 751-771, 784-792 Choa Chu Kang Street 53 / Street 54 / Street 62 / North 5 / North 6 / North 7 / Drive | COMPLETED |
Repair & Redecorations (R&R) to 33 Blks | Blk 509 to 526, 515A, 886A/B/C/D, 887A/B/C and 887 (MSCP Rooftop Garden) Woodlands Drive 14/50 and Blk 570 to 574 and 573A (MSCP Rooftop Garden) Choa Chu Kang Street 52 in Woodgrove and Limbang Divisions | In Progress |
Reroofing to 26 Blocks | Block 501 to 518, 321 to 323, 325, 326, 328, 330 & 331 Choa Chu Kang Street 51 / Woodlands Street 32 in Limbang and Woodgrove Divisions | COMPLETED |
Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks | Water Pumps Booster Pumps | COMPLETED |
Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks | Water Pumps
| COMPLETED |
Electrical Rewiring in Limbang Division | Block 787B Choa Chu Kang Drive | In Progress 6-FEB-2024 |
Cyclical Projects | Location | Status / Revised Target Completion |
---|---|---|
Replacement and Comprehensive Maintenance of Alert Alarm System (AAS) to 15 Blocks | Block 570A, 570B, 571C, 572A, 572B Woodlands Ave 1, Block 886D, 887C Woodlands Dr 50, Block 180A, 180B Marsiling Rd, Block 570, 571, 572, 573, 574 Choa Chu Kang St 52, Block 302A Woodlands St 31 | COMPLETED |
Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks | Water Pumps Booster Pumps | COMPLETED |
Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks | Water Pumps
| COMPLETED |
Repairing & Redecoration to 14 Blocks and Reroofing to 6 Blocks | Repair & Redecoration Blk 12A/B/C, 13A (MSCP Rooftop Garden), 22 to 27, 180A/B/C, 181 (MSCP Rooftop Garden) Marsiling Lane/Drive/Road Reroofing Blk 22 to 27 Marsiling Drive in Marsiling Division | In Progress |
Replacement of Lampposts and Underground Cables for Marsiling, Woodgrove and Yew Tee Divisions | Marsiling-Yew Tee Town Council | In Progress 26-JUL-23 |
Cyclical Projects | Location | Status / Revised Target Completion |
---|---|---|
Replacement of Water Pipes to 62 Blocks | Block 601-621, 625-627, 701-708, 751-771, 784-792 Choa Chu Kang Street 53 / Street 54 / Street 62 / North 5 / North 6 / North 7 / Drive | COMPLETED |
Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks | Water Pumps Booster Pumps | COMPLETED |
Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks | Water Pumps Booster Pumps | COMPLETED |
Refuse Handling Euipment Project to 31 Blocks | Block 683A/B/C, 684A/B/C/D, 685A/B/C, 686A/B/C/D, 687A/B/C/D, 688A/B/C/D, 689A/B, 690A/B/C/D, 691A/B & 692A/B Choa Chu Kang Drive/Crescent | COMPLETED |
Electrical Rewiring to 29 Blocks | Block 625 to 627 Choa Chu Kang St 62, 891A, 891B, 892A, 892B, 893A to 893D, 894A to 894D, 895A to 895C, 896A to 896C, 897A to 897C, 898A, 898B, 899A to 899C Woodlands Drive 50 | COMPLETED |
Electrical Rewiring to 21 Blocks | Blk 601 to 621 Choa Chu Kang Street 62 / North 7 | COMPLETED |
Electrical Rewiring to 23 Blocks | Block 351 to 355 Woodlands Avenue 1, Block 424 to 427 Woodlands Street 41, Block 631 to 637 Choa Chu Kang North 6, Block 638 to 643 Choa Chu Kang Street 64 and Block 787B Choa Chu Kang Drive | In Progress 6-Feb-2024 |
Repair & Redecoration (R&R) to 19 Blocks | Blocks 656 to 668 and 677 to 682 Choa Chu Kang Crescent | COMPLETED |
Replacement of Lampposts and Underground Cables for Marsiling, Woodgrove and Yew Tee Divisions | Marsiling-Yew Tee Town Council | In Progress 26-Jul-23 |
Cyclical Projects | Location | Status / Revised Target Completion |
---|---|---|
Replacement and Comprehensive Maintenance of Alert Alarm System (AAS) to 15 Blocks | Block 570A, 570B, 571C, 572A, 572B Woodlands Ave 1, Block 886D, 887C Woodlands Dr 50, Block 180A, 180B Marsiling Rd, Block 570, 571, 572, 573, 574 Choa Chu Kang St 52, Block 302A Woodlands St 31 | COMPLETED |
Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks | Water Pumps Booster Pumps | COMPLETED |
Repair & Redecoration (R&R) to 33 Blocks | Blk 509 to 526, 515A, 886A/B/C/D, 887A/B/C and 887 (MSCP Rooftop Garden) Woodlands Drive 14/50 and Blk 570 to 574 and 573A (MSCP Rooftop Garden) Choa Chu Kang Street 52 in Woodgrove and Limbang Divisions | In Progress |
Reroofing to 26 Blocks | Block 501 to 518, 321 to 323, 325, 326, 328, 330 & 331 Choa Chu Kang Street 51 / Woodlands Street 32 in Limbang and Woodgrove Divisions | COMPLETED |
Replacement of Water Pipes to 47 Blocks | Block 351-371 Woodlands Avenue 1 / Avenue 5, Block 891A-B, 892A-B, 893A-D, 894A-D, 895A-C, 896A-C, 897A-C, 898A-B and 899A-C Woodlands Drive 50 | In Progress 30-APR-2023 |
Electrical Rewiring to 20 Blocks | Block 356 to 371, 339 to 342 Woodlands Ave 1/5 | COMPLETED |
Electrical Rewiring to 29 Blocks | Block 625 to 627 Choa Chu Kang St 62, 891A, 891B, 892A, 892B, 893A to 893D, 894A to 894D, 895A to 895C, 896A to 896C, 897A to 897C, 898A, 898B, 899A to 899C Woodlands Drive 50 | COMPLETED |
Safety Provisions at Rooftops to 19 Blocks | Block 501 to 508, 502A, 527 to 536, 570A/B, 571A/B/C & 572A Woodlands Dr 14/Ave 1 | COMPLETED |
Electrical Rewiring to 23 Blocks | Block 351 to 355 Woodlands Avenue 1, Block 424 to 427 Woodlands Street 41, Block 631 to 637 Choa Chu Kang North 6, Block 638 to 643 Choa Chu Kang Street 64 and Block 787B Choa Chu Kang Drive | In Progress 6-Feb-2024 |
Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks | Water Pumps | COMPLETED |
Repairing & Redecoration to 33 Blocks | Blk 509 to 526, 515A, 886A/B/C/D, 887A/B/C and 887 (MSCP Rooftop Garden) Woodlands Drive 14/50 and Blk 570 to 574 and 573A (MSCP Rooftop Garden) Choa Chu Kang Street 52 | COMPLETED |
Repairing & Redecoration to 19 Blocks | Blks at Blk 501 to 508, 502A and 527 to 536 Woodlands Drive 14 | In Progress 3-May-2023 |
Replacement of Lampposts and Underground Cables for Marsiling, Woodgrove and Yew Tee Divisions | Marsiling-Yew Tee Town Council | In Progress 26-Jul-23 |
Cyclical Projects: Replacement and Comprehensive Maintenance of Alert Alarm System (AAS) to 15 Blocks |
Location: Block 570A, 570B, 571C, 572A, 572B Woodlands Ave 1, Block 886D, 887C Woodlands Dr 50, Block 180A, 180B Marsiling Rd, Block 570, 571, 572, 573, 574 Choa Chu Kang St 52, Block 302A Woodlands St 31 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Electrical Rewiring to 30 Blocks |
Location: Block 751 to 771, 784 to 792 Choa Chu Kang North 5 / 6 / Street 54 / Drive | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pipes to 57 Blocks |
Location: Block 501-518, 523-531, 540-569 Choa Chu Kang Street 51 / Street 52 / North 6 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pipes to 62 Blocks |
Location: Block 601-621, 625-627, 701-708, 751-771, 784-792 Choa Chu Kang Street 53 / Street 54 / Street 62 / North 5 / North 6 / North 7 / Drive | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Repair & Redecorations (R&R) to 33 Blks |
Location: Blk 509 to 526, 515A, 886A/B/C/D, 887A/B/C and 887 (MSCP Rooftop Garden) Woodlands Drive 14/50 and Blk 570 to 574 and 573A (MSCP Rooftop Garden) Choa Chu Kang Street 52 in Woodgrove and Limbang Divisions | Status / Revised Target Completion: In Progress |
Cyclical Projects: Reroofing to 26 Blocks |
Location: Block 501 to 518, 321 to 323, 325, 326, 328, 330 & 331 Choa Chu Kang Street 51 / Woodlands Street 32 in Limbang and Woodgrove Divisions | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks |
Location: Water Pumps Booster Pumps | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks |
Location: Water Pumps
| Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Electrical Rewiring in Limbang Division |
Location: Block 787B Choa Chu Kang Drive | Status / Revised Target Completion: In Progress 6-FEB-2024 |
Cyclical Projects: Replacement and Comprehensive Maintenance of Alert Alarm System (AAS) to 15 Blocks |
Location: Block 570A, 570B, 571C, 572A, 572B Woodlands Ave 1, Block 886D, 887C Woodlands Dr 50, Block 180A, 180B Marsiling Rd, Block 570, 571, 572, 573, 574 Choa Chu Kang St 52, Block 302A Woodlands St 31 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks |
Location: Water Pumps Booster Pumps | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks |
Location: Water Pumps
| Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Repairing & Redecoration to 14 Blocks and Reroofing to 6 Blocks |
Location: Repair & Redecoration Blk 12A/B/C, 13A (MSCP Rooftop Garden), 22 to 27, 180A/B/C, 181 (MSCP Rooftop Garden) Marsiling Lane/Drive/Road Reroofing Blk 22 to 27 Marsiling Drive in Marsiling Division | Status / Revised Target Completion: In Progress |
Cyclical Projects: Replacement of Lampposts and Underground Cables for Marsiling, Woodgrove and Yew Tee Divisions |
Location: Marsiling-Yew Tee Town Council | Status / Revised Target Completion: In Progress 26-JUL-23 |
Cyclical Projects: Replacement of Water Pipes to 62 Blocks |
Location: Block 601-621, 625-627, 701-708, 751-771, 784-792 Choa Chu Kang Street 53 / Street 54 / Street 62 / North 5 / North 6 / North 7 / Drive | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks |
Location: Water Pumps Booster Pumps | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks |
Location: Water Pumps Booster Pumps | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Refuse Handling Euipment Project to 31 Blocks |
Location: Block 683A/B/C, 684A/B/C/D, 685A/B/C, 686A/B/C/D, 687A/B/C/D, 688A/B/C/D, 689A/B, 690A/B/C/D, 691A/B & 692A/B Choa Chu Kang Drive/Crescent | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Electrical Rewiring to 29 Blocks |
Location: Block 625 to 627 Choa Chu Kang St 62, 891A, 891B, 892A, 892B, 893A to 893D, 894A to 894D, 895A to 895C, 896A to 896C, 897A to 897C, 898A, 898B, 899A to 899C Woodlands Drive 50 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Electrical Rewiring to 21 Blocks |
Location: Blk 601 to 621 Choa Chu Kang Street 62 / North 7 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Electrical Rewiring to 23 Blocks |
Location: Block 351 to 355 Woodlands Avenue 1, Block 424 to 427 Woodlands Street 41, Block 631 to 637 Choa Chu Kang North 6, Block 638 to 643 Choa Chu Kang Street 64 and Block 787B Choa Chu Kang Drive | Status / Revised Target Completion: In Progress 6-Feb-2024 |
Cyclical Projects: Repair & Redecoration (R&R) to 19 Blocks |
Location: Blocks 656 to 668 and 677 to 682 Choa Chu Kang Crescent | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Lampposts and Underground Cables for Marsiling, Woodgrove and Yew Tee Divisions |
Location: Marsiling-Yew Tee Town Council | Status / Revised Target Completion: In Progress 26-Jul-23 |
Cyclical Projects: Replacement and Comprehensive Maintenance of Alert Alarm System (AAS) to 15 Blocks |
Location: Block 570A, 570B, 571C, 572A, 572B Woodlands Ave 1, Block 886D, 887C Woodlands Dr 50, Block 180A, 180B Marsiling Rd, Block 570, 571, 572, 573, 574 Choa Chu Kang St 52, Block 302A Woodlands St 31 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pumpsets to 63 Blocks & Booster Pumpsets to 81 Blocks |
Location: Water Pumps Booster Pumps | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Repair & Redecoration (R&R) to 33 Blocks |
Location: Blk 509 to 526, 515A, 886A/B/C/D, 887A/B/C and 887 (MSCP Rooftop Garden) Woodlands Drive 14/50 and Blk 570 to 574 and 573A (MSCP Rooftop Garden) Choa Chu Kang Street 52 in Woodgrove and Limbang Divisions | Status / Revised Target Completion: In Progress |
Cyclical Projects: Reroofing to 26 Blocks |
Location: Block 501 to 518, 321 to 323, 325, 326, 328, 330 & 331 Choa Chu Kang Street 51 / Woodlands Street 32 in Limbang and Woodgrove Divisions | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Replacement of Water Pipes to 47 Blocks |
Location: Block 351-371 Woodlands Avenue 1 / Avenue 5, Block 891A-B, 892A-B, 893A-D, 894A-D, 895A-C, 896A-C, 897A-C, 898A-B and 899A-C Woodlands Drive 50 | Status / Revised Target Completion: In Progress 30-APR-2023 |
Cyclical Projects: Electrical Rewiring to 20 Blocks |
Location: Block 356 to 371, 339 to 342 Woodlands Ave 1/5 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Electrical Rewiring to 29 Blocks |
Location: Block 625 to 627 Choa Chu Kang St 62, 891A, 891B, 892A, 892B, 893A to 893D, 894A to 894D, 895A to 895C, 896A to 896C, 897A to 897C, 898A, 898B, 899A to 899C Woodlands Drive 50 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Safety Provisions at Rooftops to 19 Blocks |
Location: Block 501 to 508, 502A, 527 to 536, 570A/B, 571A/B/C & 572A Woodlands Dr 14/Ave 1 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Electrical Rewiring to 23 Blocks |
Location: Block 351 to 355 Woodlands Avenue 1, Block 424 to 427 Woodlands Street 41, Block 631 to 637 Choa Chu Kang North 6, Block 638 to 643 Choa Chu Kang Street 64 and Block 787B Choa Chu Kang Drive | Status / Revised Target Completion: In Progress 6-Feb-2024 |
Cyclical Projects: Replacement of Water Pumpsets to 28 Blocks & Booster Pumpsets to 33 Blocks |
Location: Water Pumps | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Repairing & Redecoration to 33 Blocks |
Location: Blk 509 to 526, 515A, 886A/B/C/D, 887A/B/C and 887 (MSCP Rooftop Garden) Woodlands Drive 14/50 and Blk 570 to 574 and 573A (MSCP Rooftop Garden) Choa Chu Kang Street 52 | Status / Revised Target Completion: COMPLETED |
Cyclical Projects: Repairing & Redecoration to 19 Blocks |
Location: Blks at Blk 501 to 508, 502A and 527 to 536 Woodlands Drive 14 | Status / Revised Target Completion: In Progress 3-May-2023 |
Cyclical Projects: Replacement of Lampposts and Underground Cables for Marsiling, Woodgrove and Yew Tee Divisions |
Location: Marsiling-Yew Tee Town Council | Status / Revised Target Completion: In Progress 26-Jul-23 |
Town Improvement Projects
Addition of new amenities and facilities, including improvement works to existing common facilities, are progressively added and/or upgraded to make the Town more pleasant.
You can expect these amenities and more to be included as part of Town Improvement Projects.
Drop-Off Porches
Playgrounds
Fitness Corners
BBQ Pits
Pavilions / Link Halls / Multi-Purpose Halls
Town Improvement Projects | Location | Status / Revised Target Completion |
---|---|---|
Upgrade 2 existing pavilions to 1 Community Hall | Limbang Park | Completed |
Construction of 2 Covered Linkways | Between Blk 544 & 545 and Blk 553 & 554 Choa Chu Kang St 52 / North 6 | Completed |
Construction Of 2 Covered Linkways | Blk 526 to Kranji Sec Sch | Completed |
Construction of 1 covered linkway | Between Blk 754 & 755 CCK North 5 | Completed |
Town Improvement Projects | Location | Status / Revised Target Completion |
---|---|---|
Construct / Upgrade Barrier-Free Access Ramp | From Blk 1 to 5A Marsiling Drive | Completed |
Construct / Upgrade Barrier-Free Access Ramp | From Blk 7 to 9 Marsiling Drive | Completed |
Construct / Upgrade Barrier-Free Access Ramp | From Blk 8 to 9 Marsiling Drive | Completed |
Construct / Upgrade Barrier-Free Access Ramp | From Blk 12 to Bus Stop Marsiling Lane | Completed |
Construct / Upgrade Barrier-Free Access Ramp | From Blk 16 to Carpark Marsiling Lane | Completed |
Construct / Upgrade Barrier-Free Access Ramp | From Blk 16 to 17 Marsiling Lane | Completed |
Construct / Upgrade Barrier-Free Access Ramp | From Blk 180A to 136 Marsiling Road | In Progress |
Construct / Upgrade Barrier-Free Access Ramp | Between Blk 122 and 123 Marsiling Rise | Completed |
Construct / Upgrade Barrier-Free Access Ramp | Blk 148 Woodlands St 13 | In Progress |
Structural Inspection and Repairs of existing timber structure linkways at Marsiling Lane / Crescent | Existing Linkways / Drop-Off Points / Pavilions in the precinct of Blk 210 to 218 Marsiling Lane / Crescent | Completed |
Construct covered low linkway | From Blk 145 to 146 Woodlands St 13 | Completed |
Construct covered low linkway | Blk 201 Marsiling Drive | Completed |
Construct awning | Blk 132 Marsiling Rise | Completed |
Town Improvement Projects | Location | Status / Revised Target Completion |
---|---|---|
Construct covered linkway | Blk 667/668 to Blk 665 Choa Chu Kang Crescent | In Progress |
Construct covered linkway | Between Blk 662 and existing linkway at Blk 691A Choa Chu Kang Crescent | In Progress |
Construct Drop-off Point | Blk 684D Choa Chu Kang Crescent | Completed |
Replace existing Multi-Purpose Hall Roofs | Blk 688, 690 and 691 Choa Chu Kang Drive / Crescent | Completed |
Town Improvement Projects | Location | Status / Revised Target Completion |
---|---|---|
Upgrading of Playground | Near Blk 571B Woodlands Avenue 1 (AR) | Completed |
Construct covered linkway | From Link Building Blk 890 in-between Blk 890A and 890B Woodlands Drive 50 to Woodlands Ave 7 MRT viaduct | Completed |
Upgrade existing Game Court | Near Blk 509 Woodlands Dr 14 | Completed |
Upgrade existing Basketball Court | Near Blk 524A Woodlands Dr 14 | Completed |
Upgrade lift lobby | Blk 321, 322 & 323 Woodlands St 31 | Completed |
Replace existing block illuminated signs to LED luminaire | Blk 321 to 326 Woodlands St 32 | Completed |
Replace existing block illuminated signs to LED luminaire | Blk 336 to 350 Woodlands Ave 1/3 and St 32 | Completed |
Replace existing block illuminated signs to LED luminaire | Blk 509 to 526 Woodlands Dr 14 | Completed |
Town Improvement Projects: Upgrade 2 existing pavilions to 1 Community Hall |
Location: Limbang Park | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construction of 2 Covered Linkways |
Location: Between Blk 544 & 545 and Blk 553 & 554 Choa Chu Kang St 52 / North 6 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construction Of 2 Covered Linkways |
Location: Blk 526 to Kranji Sec Sch | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construction of 1 covered linkway |
Location: Between Blk 754 & 755 CCK North 5 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: From Blk 1 to 5A Marsiling Drive | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: From Blk 7 to 9 Marsiling Drive | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: From Blk 8 to 9 Marsiling Drive | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: From Blk 12 to Bus Stop Marsiling Lane | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: From Blk 16 to Carpark Marsiling Lane | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: From Blk 16 to 17 Marsiling Lane | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: From Blk 180A to 136 Marsiling Road | Status / Revised Target Completion: In Progress |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: Between Blk 122 and 123 Marsiling Rise | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct / Upgrade Barrier-Free Access Ramp |
Location: Blk 148 Woodlands St 13 | Status / Revised Target Completion: In Progress |
Town Improvement Projects: Structural Inspection and Repairs of existing timber structure linkways at Marsiling Lane / Crescent |
Location: Existing Linkways / Drop-Off Points / Pavilions in the precinct of Blk 210 to 218 Marsiling Lane / Crescent | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct covered low linkway |
Location: From Blk 145 to 146 Woodlands St 13 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct covered low linkway |
Location: Blk 201 Marsiling Drive | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct awning |
Location: Blk 132 Marsiling Rise | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct covered linkway |
Location: Blk 667/668 to Blk 665 Choa Chu Kang Crescent | Status / Revised Target Completion: In Progress |
Town Improvement Projects: Construct covered linkway |
Location: Between Blk 662 and existing linkway at Blk 691A Choa Chu Kang Crescent | Status / Revised Target Completion: In Progress |
Town Improvement Projects: Construct Drop-off Point |
Location: Blk 684D Choa Chu Kang Crescent | Status / Revised Target Completion: Completed |
Town Improvement Projects: Replace existing Multi-Purpose Hall Roofs |
Location: Blk 688, 690 and 691 Choa Chu Kang Drive / Crescent | Status / Revised Target Completion: Completed |
Town Improvement Projects: Upgrading of Playground |
Location: Near Blk 571B Woodlands Avenue 1 (AR) | Status / Revised Target Completion: Completed |
Town Improvement Projects: Construct covered linkway |
Location: From Link Building Blk 890 in-between Blk 890A and 890B Woodlands Drive 50 to Woodlands Ave 7 MRT viaduct | Status / Revised Target Completion: Completed |
Town Improvement Projects: Upgrade existing Game Court |
Location: Near Blk 509 Woodlands Dr 14 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Upgrade existing Basketball Court |
Location: Near Blk 524A Woodlands Dr 14 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Upgrade lift lobby |
Location: Blk 321, 322 & 323 Woodlands St 31 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Replace existing block illuminated signs to LED luminaire |
Location: Blk 321 to 326 Woodlands St 32 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Replace existing block illuminated signs to LED luminaire |
Location: Blk 336 to 350 Woodlands Ave 1/3 and St 32 | Status / Revised Target Completion: Completed |
Town Improvement Projects: Replace existing block illuminated signs to LED luminaire |
Location: Blk 509 to 526 Woodlands Dr 14 | Status / Revised Target Completion: Completed |
Neighborhood Renewal Programme (NRP)
Residents can participate in decision-making to shape their own home precincts according to their lifestyle and recreation preferences through Neighbourhood Renewal Programmes. Selected estates for NRP is fully funded by government and residents need not pay for any upgrading fees.
The Town Council also works with local grassroots organisations and Advisers to gather consensus and feedback from residents whose precincts have been selected for upgrading.
Neighbourhood Renewal Programme (NRP) | Location | Status / Revised Target Completion |
---|---|---|
Limbang Neighbourhood Renewal Programme (NRP) | Blocks 751-761, 762-771, 784-792 Choa Chu Kang Drive/North 5 & 6/Street 54 | In Progress |
Repair & Redecoration (R&R) under the NRP to 31 Blocks | Blocks 751-761, 762-771, 784-792 Choa Chu Kang Drive/North 5&6/Street 54 | In Progress |
Neighbourhood Renewal Programme (NRP) | Location | Status / Revised Target Completion |
---|---|---|
NRP in Marsiling (Electrical Load Upgrade) | Blocks 101 - 143 Marsiling / Road / Woodlands St 13 | Completed |
NRP in Marsiling (Electrical Load Upgrade) | Blk 167 to 179 Woodlands St 11/13 | In Progress |
Neighbourhood Renewal Programme (NRP) | Location | Status / Revised Target Completion |
---|---|---|
NRP in Yew Tee | Blocks 601 - 621 & 625 - 627 Choa Chu Kang St 62 / North 7 | Completed |
Neighbourhood Renewal Programme (NRP) | Location | Status / Revised Target Completion |
---|---|---|
NRP in Woodgrove Green | Blocks 401 - 406A, 408 - 421, 424 - 429, 436 - 437 Woodlands St 41 | In Progress NRP IN PROGRESS 30-June-23 ELU IN PROGRESS 30-June-24 |
Neighbourhood Renewal Programme (NRP): Limbang Neighbourhood Renewal Programme (NRP) |
Location: Blocks 751-761, 762-771, 784-792 Choa Chu Kang Drive/North 5 & 6/Street 54 | Status / Revised Target Completion: In Progress |
Neighbourhood Renewal Programme (NRP): Repair & Redecoration (R&R) under the NRP to 31 Blocks |
Location: Blocks 751-761, 762-771, 784-792 Choa Chu Kang Drive/North 5&6/Street 54 | Status / Revised Target Completion: In Progress |
Neighbourhood Renewal Programme (NRP): NRP in Marsiling (Electrical Load Upgrade) |
Location: Blocks 101 - 143 Marsiling / Road / Woodlands St 13 | Status / Revised Target Completion Completed |
Neighbourhood Renewal Programme (NRP): NRP in Marsiling (Electrical Load Upgrade) |
Location: Blk 167 to 179 Woodlands St 11/13 | Status / Revised Target Completion In Progress |
Neighbourhood Renewal Programme (NRP): NRP in Yew Tee |
Location: Blocks 601 - 621 & 625 - 627 Choa Chu Kang St 62 / North 7 | Status / Revised Target Completion Completed |
Neighbourhood Renewal Programme (NRP): NRP in Woodgrove Green |
Location: Blocks 401 - 406A, 408 - 421, 424 - 429, 436 - 437 Woodlands St 41 | Status / Revised Target Completion In Progress NRP IN PROGRESS 30-June-23 ELU IN PROGRESS 30-June-24 |
Large-Scale Town Wide (LSTW)
Large-Scale Town Wide (LSTW): Enhancing the Connectivity and Community Bonding in Limbang / Yew Tee Estates through Development of the Green Spine below the MRT Viaduct (Phase 1) |
Location: Limbang | Status / Revised Target Completion: In Progress |